Finally, for all of you out there waiting for a how-to video on How to Make a Helical Lift...It's Finished!
45 minutes of step by step instructions on how I build my Helical Lift and what rolling ball sculpture materials you will need.
It starts with an overview of which motors I use, and why. I show you the mounting pads I use and discuss different materials you could use for a motor mount. I don't show you how to make the mounting pad, but I do explain the parts I use, and why.
Then I show you exactly how I build the spiral that lifts the marbles to the top. I discuss what bearings to use at the top of the spiral, and how I attach it to the frame. As well as how I mount the motor/mounting pad to the frame.
I then show how I build the upright keeper track that holds the marbles in as they are lifted to the top, how I install it, and finally I talk about how to add the feeder and exit tracks.
If you have wanted to try your hand at making a Helical Lift but have been unsure of where to start, this is for you. After watching this DVD you will know what steps you need to take, and why. Why buy an RBS when you can make your own? Not only will you have a cool rolling ball sculpture to show to your friends and relatives, (not to mention kick back and watch on your own!) you can impress them further by telling them you made it all by yourself. : )
Get this DVD now. Kick start that hobby, and make your own RBS to watch!
Go here: http://www.rollingballsculpture.com/videostore/
I am sold out of track clamps, but should have some in a month or so. I'll update this blog when they are done.
Payments only accepted through PayPal.
Contact me if you are interested... matthew.gaulden@gmail.com
Showing posts with label ball spirals. Show all posts
Showing posts with label ball spirals. Show all posts
Saturday, January 30, 2010
Thursday, March 6, 2008
More spirals, and a track tune-up.
I built 5 more spirals. There are three counter-clockwise and two clockwise. It's easier to make several at the same time instead of installing and making one at a time. Track tip: Don't forget to cut and face the ends of your track incoming and outgoing your spiral. It may be difficult to get a grinder in there once it is in place.
Here are those 5 spirals installed and hooked up to track. It takes a little over a minute for a marble to get from the top to the bottom of this track alone. The track is pretty close to the bottom. I will leave it where it is. I may be able to fit on one more spiral, but until I know how high the tracks will be where the they starts to merge, I want to leave myself plenty of room. I'll try and get some new video next week.
I also fixed this ugly corner I had built after the last loop d' loop. It was not smooth and very loud. In the picture above I am refering to the 90 degree corner caged in at the bottom after the last tight loop - turing away from the wall.
Here is that same corner - except it is changed into a smooth, fast, quiet corner that looks better, too. Now the exiting marble glides through that section fast, and is ready to twirl through the next set of loops . (Not yet added). Also see the left idler wheel. Ready to be idle.
Labels:
ball run,
ball spirals,
how to make,
kinetic art,
spirals,
steel wire,
wire bending,
wire track
Subscribe to:
Posts (Atom)
