The second track splitter/switch
The spaghetti track at the bottom. This section collects tracks 2 and 3, or not the loop d' loop track.
Now that it is all complete I will be starting on my next project; a wall hanging sculpture. Stay tuned!
The second track splitter/switch
The spaghetti track at the bottom. This section collects tracks 2 and 3, or not the loop d' loop track.
Now that it is all complete I will be starting on my next project; a wall hanging sculpture. Stay tuned!
1 comment:
Great stuff...........
Post a Comment