Today I was able to install the two track switches that I built yesterday before powering down my welder and lights. I also built the loop d' loop, installed it, and made the section of track that will collect the 3 tracks and merge them for the lift. The loop is very nice, with a large single loop. The ball gets shot out the end at a very high speed, and comes nearly to a stop because of the back-spin on the marble. Then the marble rolls nice and leisurely back to the lift. See the video of my progress below.
Two more tracks to go : )
No comments:
Post a Comment